Superbowl LVI
The challenge:
SuperBowl LVI - Innovative Show Design
The solution:
Role: Video design / Lead
Numbers tile count pixel examples of eye catchers:
Time line and issues:
We were on site for 18 days. Everything was built on site. From the truss to the flooring to the lights it all was brought in.
Fun facts:
Olympics were also being filmed at the same time. We had four desks built for the super bowl and one was used for the olympics as well. One desk rolled on and off the field for pre and post show which meant i had to have full access to the field.